Monday, December 17, 2012

Day #127 - Fireplace & More

The geothermal heat pump is in place and plumbed.  It looks rather like the engine room of the space ship Enterprise with gauges, valves & pipes, and is not small!  It resides in its own room inside the garage.


Jim Brown's crew came by today and finished the stone around the fireplace.  The Valerian crew finished installing the hardwood.  Here is a picture of both.


The tape is holding things in place until the glue dries.  I had a choice of nailing or gluing the floor.  I chose gluing based on the experts' recommendations.  It looks great!

No comments:

Post a Comment