Wednesday, December 12, 2012

Day 122 - Water, Water Everywhere!

Lots of things were happening at the house when I stopped in the middle of the afternoon.  The water feature is not completely finished as a few of the final touches need to be added, but it was complete enough that it was running.  And, it is absolutely fabulous!  The water spills out beneath the top rock making it appear that it is just coming right out of the hillside.  Also, the volume is just right with the perfect amount of sound and water turbulence.  Ron and his guys did a super job!


The landscapers were also working hard on the raised beds, and they are coming along nicely. Two were about half way finished.


Lots was happening on the inside as well.  Desert Pump was there wiring and plumbing the well to the HVAC room.  Kennedy Fuel can now come in and hook up the unit.  The Valerian crew was busy gluing down the hardwood flooring, and it looks great.  They were also doing some grouting.  And Ed from All Current Electric was there completing some wiring projects.  We now have more lights installed and receptacles that are hot.

Moser Paving will be in tomorrow to install the asphalt driveway, and Jim from Brown Bear Masonry was by to discuss installing the stone surround and hearth on the gas fireplace. 

No comments:

Post a Comment