Friday, November 16, 2012

Day #96 - Insulation Update

The insulation is completed as far as can be done until the dry wall is hung.


This is a photo of the living room as shot from the kitchen.  The three spots filled with fiberglass insulation is where surround sound speakers and the flat screen TV will go.


This photo is of the kitchen as shot from the living room.  The door on the left is to the patio.


And this is the master bedroom.  Note some dry wall has been hung on the ceiling.

The dry wall crew arrives Monday.  Alan, the general contractor, told me that dry wall installation will take about 10 days.