Tuesday, November 6, 2012

Day #86 - Lots Happening

Again, no picture, but lots is happening.  A two man crew spent the last 2 days caulking all the cracks & crevices throughout the whole house.  The framers are almost finished with the HardiPlank siding.  There are just a couple of areas that need finished.  Steps from the garage to the house are built.  The insulators did a walk through and know how they are going to do the foam insulation.  Another building inspection by the city is to happen tomorrow.  I met with the house painter, and we have a plan for the exterior and interior house colors and he has started caulking the outside of the house.  The electrician came yesterday and wired the outside of the house for lights on both sides of the garage door and the garage walk door.

2 comments:

  1. Love how it's coming along. Could you do some photos of the inside? Maybe the foam insulation, that kind of thing? Good thing you got so much done before tomorrow (11/8) cuz it's supposed to be Really Rainy/Snowy tomorrow!
    Best,
    Sooz

    ReplyDelete
  2. Inside photos are coming when things start happening there!

    ReplyDelete