Thursday, August 30, 2012

Day #18 - Foundation Complete

The patio has been poured and stained.  While the photo below doesn't give you a view of the pattern, you can see the color I chose.



The city inspector came today and the house passed with flying colors.  The foundation joints will be grouted, and it will be finished.

The sub floor will go down Tuesday.

I had a conversation with Barry at Kennedy Fuel.  They will ensure there are stubs from the well for the irrigation system and outside faucets.  I informed the landscape designer that we were ready for him to measure out the lot and house and begin the design process.  He will start that process Wednesday.  Kennedy Fuel will also pull the well  pump they installed and replace it with the variable speed pump the same day.

Exciting times!