Day #1

Construction started today.  The pad was cut and leveled and the footer was started to be dug.  I had a discussion with the contractor, and we decided to remove a pine tree that was near a cypress to save the cypress.  Three trees are in a clump at the back of the lot, and we decided to leave them for now.  The photo shows the progress at the end of day 1.  The vertical short dirt wall behind the heavy equipment is the back lot line.  The three trees we are saving are in the right rear of the photo.  The cypress is not visible.