Not all the trusses were set by the end of the day. There are a few left for the garage, but the house trusses are installed save for the 8 pieces that go on top to form the peak. Plus, the house was wrapped with Tyvek. With the trusses installed, the back wall of the kitchen and master bedroom can be completed. They had to wait on that as those rooms have vaulted ceilings.