It extends from one end of the lot to almost the lot line on the far side. The three raised beds of river rock were also started today. The corner stones of the first bed have been laid.
Alan and I met with Jay from Moser Paving today and we have agreed on a layout for the driveway including a hammer head turn out. With that, one can back out of the garage, back into the hammer head and pull out straight into the street. It also gives additional off street parking.
As I understand it, Kennedy Fuel is to come Wednesday to begin the installation of the geothermal HVAC system.